Project Cases with Measured Data

Twelve scrubbing projects, each with the actual gas volume and inlet/outlet concentrations. Clients are anonymized in the brochure and are shown the same way here — by industry and region.

Acid-mist scrubbing system at a battery copper-foil plant in Jiangxi (project photo)
Battery copper-foil plant, Jiangxi — acid-mist treatment system (project photo)
Biotrickling odour-control system at the Hangzhou wastewater treatment plant (project photo)
Hangzhou 100,000 t/day wastewater plant — biotrickling odour-control system (project photo)
Catalogue showcase page: Dingyu FRP fan installations in the PCB, photovoltaic, semiconductor, solid-waste, chemical, pharmaceutical, surface-treatment and municipal deodorizing industries
Industry showcases from the FRP fan catalogue — PCB, photovoltaics, semiconductors, solid waste, chemicals, pharmaceuticals, surface treatment, municipal deodorizing & sludge drying (catalogue photos)
Metal centrifugal fans with yellow belt guards installed on a rooftop with galvanized ductwork (site photo)
Metal centrifugal fans installed on site — belt-driven units with galvanized ductwork (catalogue photo)
NEW ENERGY · ZHEJIANG

Ammonia Exhaust — Ternary Precursor Production

15,000 + 10,000 Nm³/h; inlet 500 mg/m³; outlet <10 mg/m³.

Collection ducting → two-stage acid scrubbing → fan → stack.

LITHIUM BATTERY · QINGHAI

Hydrogen Chloride Gas Recovery & Scrubbing

8,000 Nm³/h; inlet approx. 500 mg/m³; outlet <10 mg/m³.

Stage-1 water scrubbing (recovery) → stage-2 alkali scrubbing → fan → stack.

PRECIOUS-METAL SMELTING · SICHUAN

HCl & NOx from Refining

10,000 Nm³/h; NO ≈ 5,000 ppm, NO₂ ≈ 3,000 ppm; outlet NOx <130 mg/m³.

Oxidation tower → reduction tower → fan → stack.

WATER-TREATMENT CHEMICALS · SICHUAN

HCl Mist from PAC Production

40,000 Nm³/h at ~110 °C; inlet 400 mg/m³; outlet <10 mg/m³.

Concentration tower (recovery) → water scrubbing → fan → alkali scrubbing → stack.

COPPER FOIL · JIANGXI

Sulfuric Acid Mist — Battery-Grade Copper Foil

Copper-dissolving section 32,000 Nm³/h; inlet 400 mg/m³; outlet <10 mg/m³.

Water scrubbing → alkali scrubbing → fan → stack.

AMINO ACIDS · HUBEI

Ammonia & Acid Gas, Two-Phase Project

Phase 1 tail gas 42,000 Nm³/h from feather hydrolysis and amino-acid production; phase 2 ammonia/acid gas from leucine & glutamine refining.

One scrubbing system per phase with circulation-liquor recovery — eliminating major raw-material losses.

STARCH · LIAONING

Corn Steeping & Starch Drying Exhaust

35,000 Nm³/h with traces of SO₂ and starch dust; outlet SO₂ <80 mg/m³, odour <2,000 (dimensionless).

Water scrubbing → alkali scrubbing → fan → stack.

MUNICIPAL WASTEWATER · HANGZHOU

Odour Control — 100,000 t/day Plant

Nine biofiltration deodorization systems; treated odour emissions meet national requirements.

Collection ducting → biotrickling filters (pre-spray + bio-oxidation) → fan → stack.

CHEMICAL WASTEWATER · WENZHOU

Wastewater-Station Odour — Gelatin Plant

8,000 Nm³/h; inlet H₂S 80 mg/m³, ammonia 50 mg/m³; reverse-membrane sealing with FRP duct collection.

Water scrubbing → biotrickling filter → mesh demister → fan → stack; emissions meet Zhejiang provincial requirements.

FLUOROCHEMICALS · SHANGYU, ZHEJIANG

HF, SO₂ & Organic Exhaust

20,000 Nm³/h total; pre-scrubbed ahead of downstream organic removal.

Three-stage alkali scrubbing → activated-carbon tower → fan → chimney.

PIGMENT CHEMICALS · JIANGSU

Chlorine-Bearing Dusty Exhaust

20,000 Nm³/h; outlet chlorine <10 mg/m³, dust <10 mg/m³.

Swirl-plate tower → water scrubbing → two-stage alkali scrubbing → fan → stack.

ELECTROPLATING · CHONGQING

Acid Mist — Automotive Parts Plating

Mainly HCl at approx. 80 mg/m³; full 50,000 Nm³/h acid-mist scrubbing system; outlet HCl <1 mg/m³.

Alkali scrubbing tower (high-efficiency mesh) → fan → stack.

Waste Incineration & Solid-Waste Projects

Hazardous-waste incineration tail-gas treatment project in Guannan, Lianyungang (project photo)
Guannan Jinyuan Environmental, Lianyungang — 20,000 t/yr hazardous-waste incineration project (project photo)

In solid-waste, sludge and hazardous-waste incineration lines, the main induced-draft fan keeps the whole process under negative-pressure control — VFD-driven and interlocked with the kiln-hood pressure gauge; high-pressure, heat-resistant and silencer-equipped. Dingyu also manufactures high-temperature, corrosion-resistant deacidification (quench) towers for the tail-gas cooling and purification train.

Selected project references — from 117 named customers in the company profile: SMIC (Shanghai), Tianma Microelectronics (Shanghai / Xiamen), Samsung Semiconductor (Xi'an), SK hynix (Wuxi), LG Electronics (Guangzhou), BOE (Chengdu / Chongqing), AU Optronics (Xiamen), Hengtong Optic-Electric, ZTT Precision Materials, Hong Kong Sha Tin Sewage Treatment Works, Jiangsu Xinqu No. 2 Wastewater Plant, Nanjing Jiangning Chengbei Wastewater Plant, Juhua Group, Nanjing Red Sun, Shandong Sun Paper, Baowu Steel Group, Masteel Group, Zijin Mining Group, Daiko Machinery (Japan), Hankook Tire (Jiaxing) — across electronics, photovoltaics, chemicals, pharmaceuticals, wastewater, machinery, paper, petrochemicals, steel and metallurgy.

Contact Us

For equipment selection, system design and quotations, reach us in one tap — chat on WhatsApp or Messenger, or send an email. We reply directly.

CONTACT
Bono Xiong
WHATSAPP (BUSINESS)
FACEBOOK PAGE
ADDRESS
Suzhou Dingyu Energy-Saving Equipment Co., Ltd. · No. 4058 Linhu Avenue, Wujiang District, Suzhou, Jiangsu, China